EMC Engineering

Construction Administration PDF Print E-mail

Atka Airport Runway Extension and Resurfacing Project, Atka, Alaska

Atka AirportExtended the runway and runway/taxiway safety areas at the Atka airport. Also included in this project was the construction of a new snow removal equipment building, installation of runway lights, wind cones and a segmented circle. Complete in 2010 - $18M

Bethel Parallel Runway, Bethel, Alaska

This project constructed a new complete parallel runway in Bethel, including new lighting and electrical systems. Complete in 2010 - $9.5M

Cope Dorbrandt Sewer Upgrade

This project consisted of replacing 1,100 feet of sewer pipe. Completed 2009 - $

Lake Otis Parkway Surface Rehabilitation, Abbott to 68th and 88th Avenue Reconstruction, Toloff to Lake Otis, Anchorage, Alaska

Rehabilitated 7,900 feet of pavement, replaced curb ramps, corrected drainage deficiencies and installed new traffic signals. Completed 2009 - $7.5M

Anchorage Area Safety Improvements Project, Anchorage, Alaska

This project provided new traffic signals, channelization improvements and raised medians throughout the Anchorage area. Completed 2009 - $3.6M

Northway Airport Permanent Repairs, Northway, Alaska

This project rebuilt the runway and taxiway that was damaged during the 2003 earthquake. This included dynamic compaction, new FAA avionics, and a new realignment of the existing road into Northway Village. Completed 2009 - $15M

Seward Highway Mile Post 43-50 Pavement Refurbishment Project, Alaska

This project consisted of reclaiming and paving 7 miles of the Seward Highway, replacing 3,500 feet of culvert pipe and replacing 17,000 feet of guardrail. Completed 2009 - $9.3M

Chief Eddie Hoffman Highway Rehabilitation; Watson’s Corner to Brown’s Slough, Bethel, Alaska

This project rehabilitated Chief Eddie Hoffman Highway from Watson’s Corner to Brown’s Slough, including drainage enhancements, bridge approach repairs and the addition of left turn lanes. Completed 2009 – $3.4M

2001 HSIP Groups 1A, 1B, 2 and 3B and HSIP Group A

This project consisted of various safety improvements throughout the Anchorage, Alaska road systems. Completed 2008 - $2.1M

Chief Eddie Hoffman Highway Rehabilitation; Airport to High School, Bethel, Alaska

This project incorporated rehabilitation and paving 3.5 miles of Chief Eddie Hoffman Hwy. Foamed Asphalt Base Course was utilized for subgrade stabilization. Completed 2008 - $9.6M

McGrath Airport Runway ReconstructionMcGrath Airport Runway Reconstruction and New GA Apron, McGrath, Alaska

Constructed a new 2,000 foot runway, a 2,480 foot runway safety area, new taxiway, and installed runway and taxiway lighting.

Completed 2008 - $5.7M

Bethel Apron Improvements, Bethel, Alaska

Reconstructed and paved two aircraft aprons in Bethel, Alaska. Electrical upgrades included installation of new power operated gates and lighted runway signs. Completed 2007 - $5.0M

Chevak Airport Relocation Phase II, Chevak, Alaska

Completed the relocation of Chevak Airport, including resurfacing runway, taxiway, apron and access roads, installation of runway and taxiway lighting, PAPI’s and REIL’s, and the construction of a new snow removal equipment building. Completed 2007 – $4.1M

Sand Point Airport Runway Rehabilitation and RSA Extension Stage 3

Rehabilitated and paved the Sand Point runway, adding an 800 foot paved runway safety area. Also included was the installation of new runway, taxiway, and approach lighting aids. Completed 2007 - $5.3M

Lake Hood Seaplane Base Echo Parking – Phase 2, & Lakeshore Taxiway Separation – Phase 2

Expanded a parking apron for small aircraft and completed a taxiway-roadway separation project. Completed 2007 - $3.8M

Ekwok Airport Rehabilitation

Completed 2007 - $

Ptarmigan Street Paving

Completed 2006 - $

Huffman Road / Elmore Road Intersection Improvements, Anchorage, Alaska

Widened Huffman roadway, improved paving, constructed retaining walls and various other landscaping work. Completed 2006 – $1.9M

New Stuyahok Airport Embankment

Completed 2006 - $

Chenega Airport Resurfacing and Lighting

Completed 2006 - $

ANC South Airpark Taxiway, Anchorage, Alaska

This project consisted of constructing two separate paved and lighted taxiways. Completed 2006 - $5.6M

tyle="mso-bidi-font-weight: normal;">Lake Hood Seaplane Base / Lake Shore Taxiway Separation

Separated the taxiway and access road along the southwest shore of Lake Hood. Completed 2006 - $

DeArmoun Road Rehabilitation – Westwind to East 140th Ave, Anchorage, Alaska

Reconstructed DeArmoun Road between Westwind and E. 140th Avenue by improving grade and alignment, adding shoulder width, and adding a new multi-use separated paved pathway. Completed 2005 - $4.9M

St Paul Airport PavementSt Paul Airport Pavement, St. Paul, Alaska

Reconstructed and paved a 6,500 foot runway, two taxiways, and two aprons using Foamed Asphalt Stabilized Base Course. Installed new runway and taxiway lighting and construction of a new snow removal equipment building. Completed 2005 - $11.8M

Dillingham Pathway

Completed 2004 - $

Aleknagik Lake Road Paving MP 8-23

Completed 2004 - $

Dillingham Runway Rehabilitation

Completed 2004 - $

 

 
You are here: Home Projects Construction Administration & Civil Engineering